Keystone retaining wall system supplied to Manchester Airport
Project name: Manchester airport spine road – keystone
Project type: Highway and infrastructure
Product: Keystone tw3
Client: BCEGI international
Contractor: GPL construction
Installer: PC construction
Anderton Concrete have recently supplied their Keystone Retaining Wall system to a project at Manchester Airport.
Anderton Concrete have recently supplied their Keystone Retaining Wall system to a project at Manchester Airport which will create a new Spine Road connecting with the existing road network near Terminal 2. Almost 1000m² of block will be used to form the two back to back walls which will rise up to just over 5m in height. The new road forms part of the Airport City North development scheme which will be one of the most exciting business destinations in the UK and one of the most significant since the Olympic Park development in 2012 covering 5 million sq ft at a cost of £650m
Similiar Stories...
Slopeloc specified for Carlton Le Willows Academy’s new 3G sports pitch
25 June 2023
A perfect partnership: How Anderton and Tensar International are working together to deliver the UK’s most challenging infrastructure projects
27 June 2023
Steps to success: Ibstock supplies staircases to major new essex development