Client: MB Bermondsey Ltd Contractor: Wates Construction Installer: Lesterose Engineer: Evolve Architects: SPPARC Architecture Scope of work: 776m2 Brick Faced GRC Grade 18P
GRC continue to innovate and develop the capabilities of Glassfibre Reinforced Concrete.
Buildable
Busy London landmark with constrained access was obviated through off-site construction.
Minimal site storage as panels are delivered to site to suit the sequence and direction of the cladding installation.
Designable
Intricate brick work features achieved with factory-controlled quality - harder to do on site so less chance of abortive work, claims, or snagging when creating brick features.
Sustainable
Mitigated waste through off-site construction by optimising material usage.
No site waste – all packaging and crates are collected for recycling.